DISTRIBUTION SERVICES

Building the infrastructure that keeps power moving safely and reliably.

ABOUT DISTRIBUTION

Valiant Energy Services delivers expert distribution solutions up to 500kV across a variety of terrains and environments. From new construction to routine maintenance, our teams build and maintain the critical infrastructure that keeps communities powered every day.

Our Partners:

  • JCPL - FE NJ
  • Met Ed - FE PA
  • ACE - Exelon
  • PEPCO - Exelon
  • PSEG - NJ
  • PPLU - PA
  • DPL - Exelon
  • PECO
  • Eversource

OUR DISTRIBUTION CAPABILITIES

OVERHEAD CAPABILITIES

INSTALLATION

Installation of new distribution structures.

ENERGIZED RECONDUCTOR SERVICES

OVERHEAD DISTRIBUTION EQUIPMENT

Installation and service of overhead distribution equipment - transformers, capacitors, regulators, reclosures, GOABs.

LOAD BALANCING AND COMMISSIONING

SECONDARY CIRCUIT RECONDUCTORING

TERMINATOR INSTALLATION

Certified terminator installation up to 35kV.

INFRASTRUCTURE

Infrastructure make ready for future facilities.

EXCAVATION

Rock Hole excavation and Vac Truck excavation upon request.

UNDERGROUND CAPABILITIES

INSTALLATION

URD cable installation and equipment installation up to 35kV.

SPLICE AND ELBOW

Certified splice installation and elbow installation up to 35kV.

FAULT LOCATING

Fault locating for emergency repairs.

CONDUIT PROOFING

New and existing conduit proofing.

PIPE INSPECTION

Pipe inspection Flow Mole or Ditch Witch trenching.

PIPE INSTALLATION

Row edge-slant Shape Decorative svg added to bottom
322-CSX Relocation

DISTRIBUTION PROJECT

SR 322 Section 103 – Chelsea Parkway Utility Relocation

As part of the SR 322 Section 103 improvement project, our team relocated overhead and underground electric distribution facilities for PECO along the Chelsea Parkway corridor. The work covered 4KV, 13KV, and 35KV systems and included setting and removing more than 100 utility poles, installing and removing nearly 25,000 feet of aerial conductor and primary cable, and replacing transformers, terminal poles, and disconnects. We also transferred reclosers, gang-operated switches, and capacitor banks, and built new underground infrastructure, including 650 feet of concrete-encased conduit bank and two manholes. Sequenced around third-party telecom transfers and coordinated with Verizon, the project kept service reliable while making way for the roadway improvements.

"...you all did an amazing job getting the relocations done on 322-CSX. It was almost effortless to coordinate and you provided some much needed float to this project."
-JD Eckman Rep