ABOUT DISTRIBUTION
Valiant Energy Services delivers expert distribution solutions up to 500kV across a variety of terrains and environments. From new construction to routine maintenance, our teams build and maintain the critical infrastructure that keeps communities powered every day.
Our Partners:
- JCPL - FE NJ
- Met Ed - FE PA
- ACE - Exelon
- PEPCO - Exelon
- PSEG - NJ
- PPLU - PA
- DPL - Exelon
- PECO
- Eversource
OUR DISTRIBUTION CAPABILITIES
OVERHEAD CAPABILITIES
UNDERGROUND CAPABILITIES
DISTRIBUTION PROJECT
SR 322 Section 103 – Chelsea Parkway Utility Relocation
As part of the SR 322 Section 103 improvement project, our team relocated overhead and underground electric distribution facilities for PECO along the Chelsea Parkway corridor. The work covered 4KV, 13KV, and 35KV systems and included setting and removing more than 100 utility poles, installing and removing nearly 25,000 feet of aerial conductor and primary cable, and replacing transformers, terminal poles, and disconnects. We also transferred reclosers, gang-operated switches, and capacitor banks, and built new underground infrastructure, including 650 feet of concrete-encased conduit bank and two manholes. Sequenced around third-party telecom transfers and coordinated with Verizon, the project kept service reliable while making way for the roadway improvements.
"...you all did an amazing job getting the relocations done on 322-CSX. It was almost effortless to coordinate and you provided some much needed float to this project."
-JD Eckman Rep